The Aerodrome integration consists of entering an aerodrome and Landing.
You must comply with control clearances before performing your Aerodrome Circuit.
The integration is done at the beginning of the Downwind Leg after a vertical pass to check the information on the Aerodrome and the state of the ground.
The vertical is done above the highest of the runway turns. 500ft is a good margin.
Status:: #wiki/notes/germinating
Plantations:: Aerodrome Traffic
References:: Le Manuel de Pilotage d'Avion